Boker Magnum Long Lead EDC Black Pocket Knife

In stock
SKU: 01SC080
Regular price £16.99 inc. VAT

Boker Magnum Long Lead EDC Black Pocket Knife

The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use.

It’s simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components.

The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock.

The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).

Overall Length: 18.4cm

Blade Length: 8 cm

Blade Thickness: 2.7mm

Weight: 78g

Blade Material: 8Cr13MoV

Handle Material: G10

Opener: Nail Nick

Opening: Manual

Lock Type: Slipjoint

Colour: Black

Blade Colour: Uncoated